Tuesday, July 20, 2021

Home is where (some) work gets done Part 2 the photos

Later than what I mentioned in the last post, here are the some of the project photos.

The Chimney removal




2nd floor before

2nd floor after

1st floor before

1st floor after

Temporary band aid


Re-shingling the front roof


Finished shingling the front yard roof

Re-shingling the backyard roof

Finished shingling the backyard roof


Last but not forgotten
Mold Remediation
The main portion of the house's attic had wide
areas of black mold on the rafters, stringers
fiberglass insulation and the underside of
roof sheeting. We had a company that
specialized in that kind of work
to clean it out and add blown in deeper insulation.


Friday, July 02, 2021

Home is where (some) work gets done

 Aside from being happily retired this year it's has been a bitch trying to get a variety of projects done.

First the standby generator. Ordered in the fall then having to wait out availability issues, various wiring issues and snow/ice till early spring when it all came together.

Next up was brick chimney removal from the middle of the house. The masonry stove it had been attached to has been long gone with the installation of a boiler system. The chimney itself was exposed on the first and second floors which would make the dismantling simpler. Actually this all came together thanks to some "rogue" masons who piece by piece worked from the ridge vent to the cement first floor. Crud, effective and not cheap which we expected beforehand.

Roofing. Re-shingling the house and the breezeway/mudroom. Garage not included. A lot of miscommunication with the project estimator, the work crew and project managers. We ended up watching everything they did to get things right as per the specifications.

Mold remediation. Technically this went well but working in an attic during a heat spell curtailed the amount time the crew could stay up there stretching the estimated days work from 4 - 6 days to 9 days. Egress to the attic was from the laundry area and the main bathroom became a pinch point for us as movement and staging needed to remain in that location and foot travel was always directly through the middle of the house.

All together there was a lot more to everything when finished.

Check back next week for project photos.